Organizational and Technical Measures 2011

06.05.2016
205

In the repair period in 2011 completed the planned organizational and technical measures to further modernize the plant.

  1. An overhaul diffusion system
  2. A reconstruction of heating circuits juice before evaporation plant with the installation of additional heater
  3. The station is automated filtering juice II saturation (filters LRF-60) at the controller MR 40
  4. A reconstruction of the station and crystallization massecuite centrifugation of installing centrifuges BW-1300S
  5. Acquired automatic analyzer carbonation gas.
  6. An enterprise quality system certification confirms compliance with national and international standards ISO 9001.